Home    Map page    Help    Contacts      LV   EN   RU
Implemented projects
This section provides information on contracted EKII projects.
 
Back

The final beneficiary: Rīgas Vecā Svētās Ģertrūdes evaņģēliski luteriskā draudze
Project name: Siltumnīcefekta gāzu emisiju samazināšanas pasākumi Rīgas Vecajā Svētās Ģertrūdes ev. lut. baznīcā
The project contract date: 2016.08.15
The total project costs (in EUR): 385606.37
EKII financing (EUR): 323766.02
Project completion date: 2020.08.15 (TERMINATED AGREEMENT)
The project aims/activities:
Name Type
J-1 existing attic ceiling treatment and the division level, additional insulation with 400mm thick insulation and wind membrane uzstādīšana.Bēniņu set bearing wall insulation and wind the membrane installation.Building insulation
J -2 existing attic ceiling treatment and the division level, additional insulation with 400mm thick insulation and wind membrane uzstādīšana.Bēniņu set bearing wall insulation and wind the membrane installation.Building insulation
Divstiklu the package (windows with glass 2.42mxl, 92m, 2.46mxl, 65m, 2.08mx! .74m) replacement with new triple insulating glass units (U Glass <0:51 W / (m2K), TL / spacer <0:04 W / (mx K ) (Thermix)).General
Divstiklu the package (windows with glass 1.52mx 1.98m, Li frame <= 2.8 W / (m2K)) replacement with new triple insulating glass units (U Glass <0:51 W / (m2K) \ y spacer <0:04 W / (mx K ) (Thermix)). Window maintenance and gasket replacement sash.General
Infiltration reduction of the air permeability of the building envelope through the external walls of the gap closing with special materials or plaster including historic window and door perimeter sealing and restorationGeneral
Solar heat gains due to the decline in the external envelope insulate and glass replacement. Internal benefits samzaināšana building.General
Paul recuperative ventilation system shall be installed in the building with heat recovery efficiency of> 85% and electrical efficiency of <0:45 Wh / m3.Ventilation
New ventilation air piesilde with electricityVentilation
New Air / air heat pump ventilation air cooling installationVentilation
All existing basement window replacement including dismantlingGeneral
construction supervision contractGeneral
author's contractGeneral
Architectural part, including energy certificateEnergy audit
AVK Engineering designGeneral
Technical inspectionGeneral
expertiseGeneral
financial reserveGeneral
Project description:
Project implementation location