Home    Map page    Help    Contacts      LV   EN   RU
Implemented projects
This section provides information on contracted EKII projects.
 
Back

The final beneficiary: Pašvaldības aģentūra "Cēsu Kultūras un Tūrisma centrs"
Project name: Siltumnīcefekta gāzu emisiju samazināšana Cēsu Izstāžu namā "Cēsu Kultūras un Tūrisma centrs"
The project contract date: 2016.08.23
The total project costs (in EUR): 173496.67
EKII financing (EUR): 111327.45
Project completion date: 2018.10.23
The project aims/activities:
Name Type
The exterior wall insulation with mineral wool 200 mm (thermal conductivity coefficient λ≤0.037 W / mK). Window openings insulationBuilding insulation
Building ceiling insulation with mineral wool 300 mm (thermal conductivity coefficient λ≤0.039 W / mK)Building insulation
Building insulation cap with a 150 mm extruded polystyrene foam (thermal conductivity coefficient λ≤0.039 W / mK)Building insulation
Ventilation systems installation with recovery and air drying proceduresVentilation
Heating system rebuilding, carried off the radiators outside floorGeneral
Door frames in the establishment of the connection to the extensionGeneral
Roof covering extension changeGeneral
Historical facade and roof renovation ofGeneral
Light switches, cable assembly, cable protection equipment. Electrical Installation rebuildingLighting
Video surveillance systemGeneral
construction supervision contractGeneral
author's contractGeneral
Building energy efficiency project developmentEnergy audit
financial reserveGeneral
Project description:
Project implementation location