The final beneficiary: Rīgas Metropolijas Romas katoļu kūrija
Project name: Rīgas Svētās Marijas Magdalēnas katoļu baznīcas kompleksa ēku energoefektivitātes paaugstināšana
The project contract date: 2016.08.23
The total project costs (in EUR): 577000.99
EKII financing (EUR): 489878.95
Project completion date: 2018.11.23
The project aims/activities:
Name Type
Attic additional insulation, attic insulation with 250 mm thick mineral wool layer (can be used for loose rock wool)Building insulation
Sealing exterior doors, exterior doors wood frame sealing improvementGeneral
Window restoration, replacement and sealing frames, wooden window frames and sealing improvement glass window installation of wooden framesGeneral
Heating pipelines in addition to insulation, pipe insulation and pārizolēšana distribution node (basement)General
The district heating distribution system reconstruction, distribution pipeline and valve replacement, installed two-pipe heating systemsGeneral
Balancing valve installed on the heating risers, install balancing valves in the heating system distribution risersGeneral
Heating system reconstruction, radiator replacement, thermostatic valve and automatic installationGeneral
Reconstruction of the heating unit in accordance with the two-pipe heating system requirementsGeneral
Recovery furnace with woodGeneral
Site preparation and maintenance M.Pils 2General
Site preparation and maintenance Monastery 4,4aGeneral
Finishing works M. Castle 2General
Finishing works monastery 4,4aGeneral
construction supervision contractGeneral
author's contractGeneral
Building energy audit reports, energy certificatesEnergy audit
Technical inspection findingsTechnical documentation
SIHP opinionsGeneral
confirmation cardsTechnical documentation
Construction cost estimateTechnical documentation
financial reserveGeneral
Attic additional insulation, attic insulation with 250 mm thick mineral wool layer (can be used for loose rock wool)Building insulation
Sealing exterior doors, exterior doors wood frame sealing improvementGeneral
Window restoration, replacement and sealing frames, wooden window frames and sealing improvement glass window installation of wooden framesGeneral
Heating pipelines in addition to insulation, pipe insulation and pārizolēšana distribution node (basement)General
Balancing valve installed on the heating risers, install balancing valves in the heating system distribution risersGeneral
The district heating distribution system reconstruction, distribution pipeline and valve replacement installed two-pipe heating systemsGeneral
Heating system reconstruction, radiator replacement, thermostatic valve and automatic installationGeneral
Reconstruction of the heating unit in accordance with the two-pipe heating system requirementsGeneral
Thermal insulation works M.Pils 2General
insulation works monastery 4,4aGeneral
Project description: