Implemented projects
This section provides information on contracted EKII projects.
Back
The final beneficiary: |
Siguldas novada pašvaldība |
Project name: |
Siltumnīcefekta gāzu emisiju samazināšana Siguldas novada Kultūras centra ēkā |
The project contract date: |
2016.10.04 |
The total project costs (in EUR): |
6229860.68 |
EKII / MF finansējuma apmērs (EUR): |
1921171.03 |
Project completion date: |
2018.10.04 |
The project aims/activities: |
Name |
Type |
Existing and future attic and roof insulation with 40cm thick mineral wool layer | Building insulation | The outer wall insulation with 30 cm mineral wool layer | Building insulation | Exterior door replacement of U=0,9W/(m2K) | General | The window construction and replacement of newly created window structure assembly U=0,85W/(m2K) | General | The cap insulation with 20 cm thick extruded siltumizolācijasslāni and a waterproofing membrane recovery | Building insulation | The new energy efficient building envelope construction of a wall U=0,1W/(m2K). Uw = 0,85W / (m2K), roof U=0,08W/(m2K) | General | Heating SITEM renovation | General | Lighting system renovation | Lighting | Renovation of ventilation systems with recuperation function | Ventilation | heat pump installation | General | DHW a solar collector | General | Shelter reconstruction, insulation | Building insulation | Floor reconstruction, insulation | Building insulation | Site preparation works | General | demolition work | General | Electrical system modification, replacement luminaires | Lighting | Stage lighting system construction (Great Hall) | Lighting | Stage lighting system construction (Cinema hall) | Lighting | Stage lighting system construction (Small Hall) | Lighting | Control and automation systems construction | General | Internal water supply, sewerage, communications networks, fire and alarm system, construction of a stage, sound system, lift construction, site improvement works, etc. works by the technical project | General | supervision | General | Construction supervision | General |
Project description: |
|
Project implementation location |
|