Home    Map page    Help    Contacts      LV   EN
Implemented projects
This section provides information on contracted EKII projects.
 
Back

The final beneficiary: Balvu novada pašvaldība
Project name: Siltumnīcefekta gāzu emisiju samazināšana Balvu kultūras un atpūtas centrā
The project contract date: 2016.10.04
The total project costs (in EUR): 1240393.17
EKII / MF finansējuma apmērs (EUR): 844534.69
Project completion date: 2019.10.04
The project aims/activities:
Name Type
S-1, thermo insulated outer wall plastering 26mm, silicate brick wall 575mm additional insulation on the outside with a 200 mm thick insulation (λd = 0.032 W / mK) forming the plaster and the inside of the 50mm thick insulation (λd = 0.035 W / mK) between the wooden battensBuilding insulation
S-2, thermo insulated outer wall plastering 26mm, silicate brick wall 575mm additional insulation inside a 200mm thick polystyrene foam insulation (λd = 0.032 W / mK). 25mm plasterboard, creating interior decorating and restoring the wiringBuilding insulation
S-3, thermo insulated outer wall plastering 26mm, silicate brick wall 510mm additional insulation on the outside with a 200 mm thick insulation (λd = 0.032 W / mK) forming the plaster and the inside of the 50mm thick insulation (λd = 0.035 W / mK) of the internal fittingsBuilding insulation
S-4, Wall nesiltināšana because after the roof insulation is building internal wallsGeneral
PAM-1 Siltināti Fundamentals earth plaster 26mm, 675mm and Masonry additional insulation with 200mm thick extruded insulation (λd = 0.035 W / mK) and WaterproofingBuilding insulation
PAM-2, Siltināti papmati underground plastering 26mm, 675mm and Masonry additional insulation with 200mm thick extruded insulation (λd = 0.035 W / mK) and Waterproofing.Building insulation
G-1, basement floor to the bottom: 10 mm The floor, concrete screed 20mm, 100mm Reinforced additional insulation with 200mm thick insulation (λd = 0.035 W / mK)General
G-2, the 1st floor to the bottom floor: Floor covering 20mm, concrete 20mm izlīdzonšā layer, reinforced concrete 200mm additional insulation with 200mm thick insulation (λd = 0.035 W / mK)General
J-1 Roof covering: Roofing insulation Interior decoration 12mm Steam membrane Pro Clima Intell, Insulation 400mm / 400mm wooden beams, Insulation 50mm / 400mm wooden beamsBuilding insulation
J-2 Roof covering: Roofing insulation Interior decoration 12mm Steam membrane Pro Clima Intell, Insulation 400mm / 400mm wooden beams, Insulation 50mm / 400mm wooden beamsBuilding insulation
Wooden door, 1.64mx3.17m, replacement of gaisanoturīgām, heatproof doors with double pārfalci and two sealing rubber perimeter. Perimeter wind membranes connection with the front wall. Historic door repair and sealing.General
Wooden door, 1.45mx2.59m, replacement of gaisanoturīgām, heatproof doors with double pārfalces working and two sealing rubber perimeter. Perimeter wind membranes connection with the front wall. Door Integration building insulation zone.General
Wooden door, 1mx2.10m, replacement of gaisanoturīgām, heatproof doors with double pārfalces working and two sealing rubber perimeter. Perimeter wind membranes connection with the front wall. Door Integration building insulation zone.General
Wooden door, 0,95mx2.10m, replacement of gaisanoturīgām, heatproof doors with double pārfalces working and two sealing rubber perimeter. Perimeter wind membranes connection with the front wall. Door Integration building insulation zone.General
PVC door, 1,30mx2.10m with glass replacement against gaisanoturīgām, heatproof doors with double pārfalces working and two sealing rubber perimeter. Perimeter wind membranes connection with the front wall. Door Integration building insulation zone.General
Wooden door, 1,10mx2.10m, replacement of gaisanoturīgām, heatproof doors with double pārfalces working and two sealing rubber perimeter. Perimeter wind membranes connection with the front wall. Door Integration building insulation zone.General
PVC window frame divstikla package 1.20mx2.10m, U frame <= 1.4 W / (m2K) Ustikls <= 1.5 W / (m2K) ѱ spacer <= 0.04W / (mx K) (Thermix) ѱ assembly < = W / (mx K), the packet divstiklu replacement with new triple insulating glass unitsGeneral
PVC window frame divstikla package 1.20mx1.45m, U frame <= 1.4 W / (m2K) Ustikls <= 1.5 W / (m2K) ѱ spacer <= 0.04W / (mx K) (Thermix) ѱ assembly < = W / (m xK) of divstiklu new replacement with new triple insulating glass unitsGeneral
PVC window frame divstikla package 1.50mx2.10m, U frame <= 1.4 W / (m2K) Ustikls <= 1.5 W / (m2K) ѱ spacer <= 0.04W / (mx K) (Thermix) ѱ assembly < = W / (m xK) of divstiklu new replacement with new triple insulating glass unitsGeneral
PVC window frame divstikla package 1.50mx1.60m, U frame <= 1.4 W / (m2K) Ustikls <= 1.5 W / (m2K) ѱ spacer <= 0.04W / (mx K) (Thermix) ѱ assembly < = W / (m xK) of divstiklu new replacement with new triple insulating glass unitsGeneral
PVC window frame divstikla package 1.40mx2.30m, U frame <= 1.4 W / (m2K) Ustikls <= 1.5 W / (m2K) ѱ spacer <= 0.04W / (mx K) (Thermix) ѱ assembly < = W / (m xK) of divstiklu new replacement with new triple insulating glass unitsGeneral
PVC window frame divstikla package 1.64mx3.208m, U frame <= 1.4 W / (m2K) Ustikls <= 1.5 W / (m2K) ѱ spacer <= 0.04W / (mx K) (Thermix) ѱ assembly < = W / (m xK) of divstiklu new replacement with new triple insulating glass unitsGeneral
Infiltration air permeability reduction (test method after renovation air permeability test at 50 Pa) of the building envelope through the external walls of the gap closing with special materials or plasterGeneral
Solar heat gains due to the decline in the external envelope insulate and glass replacement. Internal benefits samzaināšana building.General
Indoor temperatures on renovation increase to +19 ° C.General
Paul recuperative ventilation system shall be installed in the building with heat recovery efficiency of> 85% and electrical efficiency of <0:45 Wh / m3.Ventilation
Heating system renovation during the entire first floor to the bottom space and basement space and ground low temperature floor heating / cooling EstablishmentGeneral
Of the old type fluorescent lamps replacement with LED-type lamps without compromising on light levels in the room, including electrical wiring, switches and distributor frames-enabled replacementLighting
Reduction of thermal bridges in building construction zone No. 1General
Circulating pump for heating the replacement of the circulation pump for heating WILO TOP Z20 / 4General
New earth heat pump "GHT" (without compressor) cooling / piesildīšanas plant (cooling / piesildīšanas maximum power 28kW, 45kW, 45kW and energy consumed 280W, 450W, 450W) InstallationGeneral
PV panel installation on the roof of the building 197 m2, including the inverter, the building distribution system and a new type of distributor frames installation, as well as double the meter installation and alignment.General
demolition workGeneral
Create a floor ventilation unitsGeneral
Fire the overpressure systemGeneral
Underfloor heating system constructionGeneral
Ventilation systems piesilde of the heating unitVentilation
financial reserveGeneral
Project description:
Project implementation location