Implemented projects
This section provides information on contracted EKII projects.
Back
The final beneficiary: |
Daugavpils pilsētas pašvaldība |
Project name: |
Siltumnīcefekta gāzu emisiju samazināšana Daugavpils 26. pirmsskolas izglītības iestādē |
The project contract date: |
2016.10.04 |
The total project costs (in EUR): |
1292142.52 |
EKII / MF finansējuma apmērs (EUR): |
751171.65 |
Project completion date: |
2019.10.04 |
The project aims/activities: |
Name |
Type |
External wall insulation from the outside with stone wool | Building insulation | Plinth and foundation insulation (at a depth of 1.2 m below ground level). 'S upper reinforcement and decorative trim. Restoration of the building curbs. | Building insulation | Existing roof covering insulation dismantling. Roofing insulation with rock wool. | Building insulation | On the bottom floor insulation with insulation material and basement ceiling insulation with insulation material. | Building insulation | Exterior door replacement U <0,8 W / (m2K) | Building insulation | All the window block, shop replacement of selective glass window, shop windows U <0,8 W / (m2K) | Building insulation | Recuperation systems with installation efficiency> 90% in accordance with the regulatory requirements | Building insulation | Reconstruction of heat supply systems. Two-pipe heating system construction. Radiator replacement, thermostat uzstādīšana.Jauna automated heating unit installation. | Building insulation | Vacuum solar installation for hot water preparation | Building insulation | Construction supervision | Technical documentation | supervision | Technical documentation | publicity | General | Bulkheads and engineering Demolition | General | drying cabinets | General | staircase installation | General | sloping | General | Fat separator aka | General | WC partition installation | General | Water supply and sewerage | General | Switchboards | General | Lightning protection, grounding | General | Fire alarm networks | General | Automatic security alarm system | General | Improvement works | General | financial reserve | General |
Project description: |
|
Project implementation location |
|