Home    Map page    Help    Contacts      LV   EN
Implemented projects
This section provides information on contracted EKII projects.
 
Back

The final beneficiary: Cēsu novada pašvaldība
Project name: Cēsu pilsētas Pastariņa sākumskolas ēkas atjaunošana par zema enerģijas patēriņa ēku, Raunas ielā 7, Cēsīs, Cēsu novadā
The project contract date: 2016.10.03
The total project costs (in EUR): 1246384.51
EKII / MF finansējuma apmērs (EUR): 923952.57
Project completion date: 2018.07.03
The project aims/activities:
Name Type
Replacement of old wooden windows with new wooden windows with triple insulating glass units with a total Uw ≤ 0.8 W / (m2K) [Uf ≤ 1.0 W / (m2K); Ug ≤ 0,5 W / (m2K) with glass partitions of the composite material Ψg ≤ 0.031 W / (mK); Gg ≥ 0.5].Building insulation
Old wooden door replacement with new wood doors with three glass panels or packages with a total Ud ≤ 1,2W / (m2K) [Uf ≤ 1.7 W / (m2K); Ug ≤ 0,5 W / (m2K) with glass partitions of the composite material Ψg ≤ 0.031 W / (mK)].Building insulation
The first floor of the floor structure dismantling. New concrete floor on the ground Creating and insulation. Building the basis for renovation and insulation from the outside soil freezing depth.Building insulation
Existing basement heated and unheated basement floor structure dismantling. New concrete floor on the ground and the establishment of siltināšana.Pagrabstāva wall renovation and insulation from the outside bottom freezing depthsBuilding insulation
Unheated basement (thermal node, the old boiler room) ceiling insulation from the bottom of a 180mm thick mineral wool λ ≤ 0.037 W / mK.Building insulation
Building brick outer wall (excluding the oldest parts of the building wall) recovery and insulation from the outside with 200 mm thick mineral wool λ ≤ 0.037 W / mK according to ETAG-004 guidelines.Building insulation
The oldest part of the building brick exterior wall insulation on the inside with polyurethane slabs 100 mm thick, λ≤ 0.023 W / mK. Interior decoration izveidošana.Telpu atjaunošana.Krāsošana.Building insulation
Dismantling the old insulation in the attic. All drempeļsienu inner surface of insulation 150 mm thick insulation membrane minerālvati.Tvaika floating diffusion resistance spreading. Ceiling insulation with loose mineral wool 400 mm thick.Building insulation
Mechanical ventilation system with recuperation of creation. Space redecoration associated with ventilation systems for the construction works.Ventilation
Heat unit conversion and automatic installation of heat recovery systems mezglā.Apkures or pārbūve.Telpu recovery related to the heating system renovation or rebuilding work.General
The fluorescent and halogen light bulb replacement of LEDspuldzēm. Wiring reconstruction.Lighting
financial reserveGeneral
The othersGeneral
Project description:
Project implementation location