Name |
Type |
1-1 Site installation and maintenance | Building insulation |
1-2 Excavation | Building insulation |
1-3 Basics and substrate | Building insulation |
1-4 walls, buildings and structures of the substructure | Building insulation |
1-5 Partitions | Building insulation |
Covering 1-6 | Building insulation |
1-6.1 Steel Structures | Building insulation |
1-7 stair constructions, landings | Building insulation |
1-8 Floor bases, floors | Building insulation |
1-9 roofs, floors | Building insulation |
1-10 of column filling elements, special design of the facade | Building insulation |
1-11 Finishing work | Building insulation |
1-12 Entrance porch, stairs, terraces, canopy system | Building insulation |
1-13 Interior furniture (Built-in furniture, ordinary furniture, acoustic curtains medicine small medicine chairs, all kinds of signs and plaques, choir benches, cupboards and medicine acoustic wall panels) | General |
1-14 Territory improvement works | General |
1-15 Miscellaneous (outdoor lettering large and small) | General |
2-1 power supply networks, lighting | Building insulation |
2-2 Heating, Cooling | Building insulation |
2-3 Ventilation | Building insulation |
2-4 heating units | Building insulation |
2-5 Water supply and sewerage | Building insulation |
2-6 Electronic communication systems. Telecommunications systems (including digital blackboards, electronic microclimate monitoring system) | Building insulation |
2-14 Control and automation systems. Climate control system. | Building insulation |
2-15 Control and automation systems. Blind control system. | Building insulation |
2-16 Control and automation systems. Energy accounting system. | Building insulation |
2-17 Control and automation systems. Light Management System. | Building insulation |
3-3 Heat | Building insulation |
3-4 Water supply and sewerage | Building insulation |
With the realization of the construction project-related costs in cooperation with vocational education competence centers "Ventspils High School Musical" | General |
Construction supervision, supervision, construction commissioning, envelope control of sound insulation measurements, room reverberation measurements, suspended ceiling construction of the Great Hall and other costs | Technical documentation |