Implemented projects
This section provides information on contracted EKII projects.
Back
The final beneficiary: |
Rīgas Vecā Svētās Ģertrūdes evaņģēliski luteriskā draudze |
Project name: |
Siltumnīcefekta gāzu emisiju samazināšanas pasākumi Rīgas Vecajā Svētās Ģertrūdes ev. lut. baznīcā |
The project contract date: |
2016.08.15 |
The total project costs (in EUR): |
385606.37 |
EKII / MF finansējuma apmērs (EUR): |
323766.02 |
Project completion date: |
2020.08.15 (TERMINATED AGREEMENT) |
The project aims/activities: |
Name |
Type |
J-1 existing attic ceiling treatment and the division level, additional insulation with 400mm thick insulation and wind membrane uzstādīšana.Bēniņu set bearing wall insulation and wind the membrane installation. | Building insulation | J -2 existing attic ceiling treatment and the division level, additional insulation with 400mm thick insulation and wind membrane uzstādīšana.Bēniņu set bearing wall insulation and wind the membrane installation. | Building insulation | Divstiklu the package (windows with glass 2.42mxl, 92m, 2.46mxl, 65m, 2.08mx! .74m) replacement with new triple insulating glass units (U Glass <0:51 W / (m2K), TL / spacer <0:04 W / (mx K ) (Thermix)). | General | Divstiklu the package (windows with glass 1.52mx 1.98m, Li frame <= 2.8 W / (m2K)) replacement with new triple insulating glass units (U Glass <0:51 W / (m2K) \ y spacer <0:04 W / (mx K ) (Thermix)). Window maintenance and gasket replacement sash. | General | Infiltration reduction of the air permeability of the building envelope through the external walls of the gap closing with special materials or plaster including historic window and door perimeter sealing and restoration | General | Solar heat gains due to the decline in the external envelope insulate and glass replacement. Internal benefits samzaināšana building. | General | Paul recuperative ventilation system shall be installed in the building with heat recovery efficiency of> 85% and electrical efficiency of <0:45 Wh / m3. | Ventilation | New ventilation air piesilde with electricity | Ventilation | New Air / air heat pump ventilation air cooling installation | Ventilation | All existing basement window replacement including dismantling | General | construction supervision contract | General | author's contract | General | Architectural part, including energy certificate | Energy audit | AVK Engineering design | General | Technical inspection | General | expertise | General | financial reserve | General |
Project description: |
|
Project implementation location |
|