The final beneficiary: |
Pašvaldības aģentūra "Cēsu Kultūras un Tūrisma centrs" |
Project name: |
Siltumnīcefekta gāzu emisiju samazināšana Cēsu Izstāžu namā "Cēsu Kultūras un Tūrisma centrs" |
The project contract date: |
2016.08.23 |
The total project costs (in EUR): |
173496.67 |
EKII / MF finansējuma apmērs (EUR): |
111327.45 |
Project completion date: |
2018.10.23 |
The project aims/activities: |
Name |
Type |
The exterior wall insulation with mineral wool 200 mm (thermal conductivity coefficient λ≤0.037 W / mK). Window openings insulation | Building insulation | Building ceiling insulation with mineral wool 300 mm (thermal conductivity coefficient λ≤0.039 W / mK) | Building insulation | Building insulation cap with a 150 mm extruded polystyrene foam (thermal conductivity coefficient λ≤0.039 W / mK) | Building insulation | Ventilation systems installation with recovery and air drying procedures | Ventilation | Heating system rebuilding, carried off the radiators outside floor | General | Door frames in the establishment of the connection to the extension | General | Roof covering extension change | General | Historical facade and roof renovation of | General | Light switches, cable assembly, cable protection equipment. Electrical Installation rebuilding | Lighting | Video surveillance system | General | construction supervision contract | General | author's contract | General | Building energy efficiency project development | Energy audit | financial reserve | General |
Project description: |
|
Project implementation location |